Welcome, Guest |
You have to register before you can post on our site.
|
Online Users |
There are currently 646 online users. » 1 Member(s) | 642 Guest(s) Bing, Google, Yandex, xaniae2
|
|
|
người đàn ông trong nhà |
Posted by: AleksShamles - 05-11-2022, 09:48 AM - Forum: Discussion
- Replies (8)
|
|
Hôm qua tôi đã leo lên các trang web và xem và nghiên cứu rất nhiều thông tin khác nhau về kiếm tiền trực tuyến. Thật nhiều điều thú vị. Họ có thanh toán ở khắp mọi nơi không? Còn bạn, bạn chọn gì cho mình?
|
|
|
besthindiquotes |
Posted by: jonamdicks - 05-10-2022, 03:52 PM - Forum: Discussion
- Replies (33)
|
|
this is the best motivational quotes in hindi Inspirational quotes Best motivational quotes by besthindiquotes. You know those moments when using a popular quote is the best way to express what you want to say?
|
|
|
more about sommerseo |
Posted by: jonamdicks - 05-10-2022, 03:33 PM - Forum: Discussion
- Replies (9)
|
|
Der more about sommerseo Contest 2022 vom Anbieter SEO-Vergleich.de. Das Schlagwort für dieses Jahr lautet SommerSEO. This is an informative post and very useful. So, I would like to thank you for the efforts you have made in writing this article.
|
|
|
All You Need To Know About Aluminium Extrusion |
Posted by: Thomas - 05-04-2022, 11:28 PM - Forum: Shared Hosting
- Replies (28)
|
|
Lead times can vary significantly within the aluminium extrusion industry. The current delivery times for some specialized products are:
• Drawn Seamless Aluminium Pipe 50-60 weeks
• Structural extrusions in 7xx and 2xx alloys 25-30 weeks
• Bull's eye tube stretched 12-14 weeks
Fortunately, KMC Aluminium is one of the best Tamilnadu aluminium company and has invested in new equipment and facilities over the last 7 years. As a result, our lead times for custom aluminium extrusions have not changed significantly in the last four to five years.
Delivery times generally reflect the demand for a company's products. The extruded aluminium industry currently has a very healthy demand for its products. Automakers have incorporated more aluminium into their designs for added safety and greater fuel efficiency.
Aircraft manufacturers are building airplanes at a record rate. Commercial and residential construction is booming in many regions. For aluminium extrusions and extruded tubes, the lead time for your order is a function of three factors: lead time for tools; extrusion lead time; Manufacturing lead time.
Tool lead time is the amount of time required to manufacture an extrusion die. For a simple solid extrusion, such as a 1.00 ”diameter rod or a 90 degree angle, the die is made from one piece of H13 tool steel. The lead time to produce an extrusion die is 2-3 weeks. If you wish to order a die for a .500 ”diameter tube, the lead time is 3-4 weeks. The difference in delivery time is explained by the fact that an extrusion die for a tube is more complicated than for a solid form. The die is made up of two pieces of steel that must fit together perfectly to produce the tube correctly.
Extrusion lead time consists of the time your order waits in queue to start production and the actual time it takes for your order to go through the manufacturing steps. Approximately 75% of the extrusion lead time is waiting in the queue. The actual extrusion production time for an order can take 15 minutes to a few hours to extrude, depending on its size. Extrusions are rapidly cooled out of the press, stretched to straighten, and cut to size. The extrusions are then artificially aged for eight to twelve hours to achieve their final temper. The total time from extrusion to cooling after artificial aging is 48 hours.
After aging, the extrusions are ready for packaging or further processing. If your order does not require any fabrication, it will generally be packed and shipped 2-3 days after the aging step is complete.
Many projects require that the aluminium profile suppliers tubes and extrusions be fabricated or coated in some way after aging. The processes that are normally requested are: cut to size, deburring, drilling of holes or slots, anodizing and coating with chemical film. A good rule of thumb for lead times for these processes is to add 1 to 2 weeks for each required process to the lead time of the extruded design.
|
|
|
HVR resistor |
Posted by: jonamdicks - 05-02-2022, 04:10 PM - Forum: Discussion
- Replies (40)
|
|
HVR resistor is a modern type non-inductive design resistor, composite with 96% Al2O3 substrate, and Ruthenium series (RuO2) resistance paste, and burn-in 850℃. Comparing the traditional carbon film and metal film resistors. HV thick film resistor offers higher voltage withstand, higher reliability, higher working temperature, and very small temperature coefficient and stable voltage coefficient.
|
|
|
sphynx cat for sale |
Posted by: jonamdicks - 05-02-2022, 04:01 PM - Forum: Discussion
- Replies (7)
|
|
The Sphynx seems like a contradiction: a hairless cat? But people who come to know him soon fall under the spell of this bald but beautiful feline. His warmth, humor and exotic appearance all combine to make him a favorite with cat lovers. Visit us to buy sphynx cat for sale breeds.
|
|
|
|